We have the first coat of paint, most of the crown molding and baseboards in. Waiting on a couple of interior doors so they have not installed all moldings and baseboards.
This is in the master bedroom. The architect had drawn in some shelving that would be open to the sitting area. I asked the framers to frame it in and make a small closet out of the space. I can use that for linens. Can never have too much storage. We ordered this shutter door for it. It will be perfect!
We have shelving in the closets. Waiting for the rods to be installed.
Cannot wait to see this space transform into our dream kitchen!
The dining area.
The Living area
The sunroom
Hope to see more progress this week. I’ll keep you posted.